€84.800 -0.82 %   19/07/2018 15:49
Media    >    News update    >    Works beside Windsor Castle (01/03/2017)

News update

Works beside Windsor Castle

Works beside Windsor Castle

1 March 2017 - Projects update and handover - United Kingdom

Eurovia Surfacing has just completed resurfacing works in Thames Street, which runs alongside one side of Windsor Castle and serves the castle’s main entrance.

The works were carried out within the framework of the annual programme of works – renewed each year since 2014 – for which Eurovia Surfacing is responsible on behalf of the Royal Borough of Windsor and Maidenhead. Teams planed the existing surface (1,800 sq. metres) and replaced it with a 45 mm-thick pavement that includes a 14 mm surface course.
Annual value of the works: €1.2m.

Media contacts

Paul-Alexis Bouquet
Tel: +33 1 47 16 35 00
media.relations@vinci.com