€110.850 The share price increased by +0.68 %   03/05/2024 17:35

Widening the A63 motorway

Illustration image

1 October 2015 - Projects update and handover - France

The joint venture composed of Eurovia GPI, VINCI Construction Terrassement and Dodin Campenon Bernard (VINCI Construction subsidiaries), together with GTM Sud-Ouest TP (VINCI Construction France), is widening the A63 motorway in both traffic directions, between Biarritz and the Spanish border, on behalf of ASF (VINCI Autoroutes). Widening this 22 km-long section from two to three lanes is intended to make HGV traffic safer and improve traffic flow in the peak summer period.