Projects update and handover
France
Demolition of industrial buildings in east of France
In Longwy, teams from Cardem Metz (Eurovia) are removing asbestos from and totally demolishing six industrial buildings (including a 750 m-long workshop) at the Société du Train Universel de Longwy’s former site for the production and fabrication of metal sections. Launched in July 2014 with site safety works and the evacuation of fluids and pollutants, the works continue with the clearance, removal of asbestos from and mechanical deconstruction of the buildings.