| non-inclus | Country | End of contract | Accounting model | Consolidation method |
|---|---|---|---|---|
| VINCI Highways | ||||
|
Vía Sumapaz (formerly Vía 40 Express) Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km) |
Colombia | 2046 | Intangible asset | FC |
|
Gefyra Toll bridge between Rio and Antirrio |
Greece | 2039 | Intangible asset | FC |
|
Lima Expresa Línea Amarilla: 25 km toll expressway in Lima |
Peru | 2049 | Intangible asset | FC |
|
Strait Crossing Development Inc. Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick |
Canada | 2032 | Intangible asset | FC |
|
A4 Hörselberg A-Modell 45 km |
Germany | 2037 | Intangible asset | EM |
|
A5 Malsch–Offenburg A-Modell 60 km |
Germany | 2039 | Intangible asset | EM |
|
A7 Göttingen–Bockenen A-Modell 60 km to be renovated, including 29 km to be widened to 2×3 lanes |
Germany | 2047 | Financial asset | EM |
|
A9 Six-lane A-Modell – Via Gateway Thüringen 47 km |
Germany 2031 | Financial asset | EM | |
|
B247 federal road – Via Mülhausen 22 km plus 6 km of approach roads |
Germany 2051 | Financial asset | EM | |
|
Entrevias Toll highways in São Paulo state (570 km) |
Brazil | 2047 | Intangible asset | EM |
|
Olympia Odos Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction |
Greece | 2038 | Intangible asset | EM |
|
D4 motorway – Via Salis 32 km plus 16 km to be widened to 2×2 lanes |
Czech Republic | 2049 | Financial asset | EM |
|
Hounslow Rehabilitation and maintenance of roadways, traffic signs and lighting |
United Kingdom | 2037 | Financial asset | EM |
|
Isle of Wight Rehabilitation and maintenance of roadways, traffic signs and lighting |
United Kingdom | 2038 | Financial asset | EM |
|
Granvia R1 expressway (Via Pribina) between Nitra and Tekovské Nemce |
Slovakia | 2041 | Financial asset | EM |
|
Regina Bypass 61 km expressway bypassing Regina |
Canada | 2049 | Financial asset | EM |
|
Ohio River Bridges – East End Crossing Bridge over the Ohio River and access tunnel |
United States | 2051 | Financial asset | EM |
| VINCI Railways | ||||
|
LISEA South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux |
France | 2025 | Intangible asset | FC |
| VINCI Stadium | ||||
|
Consortium Stade de France 80,000-seat stadium at Saint-Denis |
France | 2025 | Intangible asset | FC |
FC: Full consolidation; EM: Equity method.
Certain contracts may benefit from investment grants from the grantor. This relates mainly to contracts under the financial asset model, but also certain contracts with traffic level risk (Arcour (A19), LISEA and Consortium Stade de France).
As a general rule, when the contracts end, the concession infrastructure is returned to the grantor for no consideration. In the event that the contract is terminated or the asset under concession is bought out early by the grantor, compensation is payable to the concession holders. Its amount is determined in accordance with contractual or statutory provisions.