2025 Universal Registration Document

General and financial elements

Optimising resources thanks to the circular economy
Optimising resources thanks to the circular economy
Group commitments Performance in 2025 Reference
Promote the use of construction techniques and materials that economise on natural resources

Promote the use of construction techniques and materials that economise on natural resources

Performance in 2025


18% reduction in upstream Scope 3 GHG emissions of VINCI Construction in 2025

Promote the use of construction techniques and materials that economise on natural resources

Reference

Circular economy, 2.3.2.1 (page 228)

Expand the offer of recycled materials to limit the extraction of virgin materials

Expand the offer of recycled materials to limit the extraction of virgin materials

Performance in 2025

Circular economy, 2.3.2.3 (page 231)

Improve waste sorting to implement waste recovery more widely

Improve waste sorting to implement waste recovery more widely

Performance in 2025

70% of waste recovered in 2025

Improve waste sorting to implement waste recovery more widely

Reference

Circular economy, 2.3.2.2 (page 229)

Optimising resources thanks to the circular economy
Business line commitments Performance in 2025 Reference
Concessions

VINCI Concessions(*)

Zero waste to landfill by 2030 21% 2.3.2.2 page 229
VINCI Autoroutes 100% reuse of reclaimed asphalt pavement from worksites by 2030, of which 45% reused at VINCI Autoroutes’ own worksites 47% of reclaimed asphalt pavement reused in 2025 2.3.2.2 page 229
100% of non-hazardous waste recovered, of which 80% material recovery from operations waste 81% of waste material recovered from operations waste 2.3.2.2 page 229
Energy Solutions VINCI Energies 80% of inert waste recycled by 2030 71% 2.3.2.2 page 229
Construction VINCI Construction Double the production of recycled materials at quarries and processing facilities to 20 million tonnes by 2030 compared with 2019 levels 16 million tonnes 2.3.2.3 page 231
90% of waste recovered for the Major Projects Division by 2030 94% 2.3.2.2 page 229