2025 Universal Registration Document

General and financial elements

In addition, VINCI has made deep commitments to scale up the circular economy and preserve natural environments. These three focuses of its strategy are interdependent. Therefore, although each pillar of the Group’s environmental ambition has its own levers for action, any initiative undertaken on one pillar has positive repercussions on the other two. For example, by addressing climate change and lowering resource use, VINCI is also alleviating two pressures on biodiversity.

VINCI is mobilising its teams and its potential for innovation to accelerate the transformation of its business lines and the creation of environmental value in the projects it leads for its customers, as well as in the services it provides for its infrastructure users and partners. The integrated design-build-operate approach helps reduce environmental impact at each stage of a project’s life cycle. The development of partnerships with external stakeholders is focused on this same goal. 

VINCI’s environmental ambition is structured into three key interdependent pillars: acting for the climate, optimising resources thanks to the circular economy and preserving natural environments.

Acting for the climate
Acting for the climate
Group commitments Performance in 2025 Reference

Group commitments

40% reduction in direct greenhouse gas (GHG) emissions (Scope 1 and market-based Scope 2) by 2030 from the 2018 baseline

Performance in 2025

26% reduction in the Group’s direct greenhouse gas (GHG) emissions from 2018 levels adjusted for acquisitions and disposals

Reference

Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)

Group commitments

20% reduction in indirect upstream and downstream GHG emissions (Scope 3) by 2030 from the 2019 baseline

Performance in 2025

4% reduction in the Group’s indirect GHG emissions from 2019 levels adjusted for acquisitions and disposals

Reference

Transition plan, 2.2.2.1 (pages 205 to 206 and 210 to 220) and 2.2.3.2 (page 224)

Group commitments

Adaptation of infrastructure and activities to improve their climate resilience

Performance in 2025

Risk map created for assets Adaptation of action plans in progress at business lines

Reference

Climate change adaptation, 2.2.2.2 (page 220)

Acting for the climate
Business line commitments Performance in 2025 Reference
Concessions

VINCI Concessions (*)

67% reduction in Scope 1 and Scope 2 GHG emissions by 2030 from 2018 levels 65% Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)
Development of a climate adaptation plan initiated by 2026 for 100% of assets exposed to significant physical risks 13% Adaptation actions, in 2.2.2.2 (page 221)
VINCI Airports Net zero emissions (Scopes 1 and 2) for airports in Europe (including London Gatwick and Edinburgh) by 2030 and for the rest of the scope by 2050 ACA Level 5 certification achieved by six airports, after meeting the net zero emissions target Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)
VINCI
Autoroutes

50% average reduction in GHG emissions per project carried out across the network by 2030 from 2019 levels

See Group performance Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)
20% reduction in the GHG emissions of purchases and commercial installations (Scope 3) by 2030 from 2019 levels
Construction VINCI Construction 90% low-carbon concrete used in projects by 2030 (Scope 3) 32% Decarbonisation area E, 2.2.2.1 (page 215)
Reduction in the consumption of asphalt plants to 70 kWh/tonne of asphalt produced by 2030 81 kWh/tonne Decarbonisation area C, 2.2.2.1 (page 214)
VINCI Immobilier 50% reduction in the carbon intensity per square metre of property development operations by 2034 (Scope 3) See Group performance Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)
40% reduction in carbon footprint intensity per resident of serviced residences by 2030 Transition plan, 2.2.2.1 (pages 210 to 220) and 2.2.3.2 (page 224)
Energy Solutions Cobra IS 12 GW of renewable energy production capacity in operation and/or under construction bv 2030 5 GW Low-carbon energy production infrastructure, in 2.2.2.1 (page 218)