2024 Universal Registration Document

General and financial elements

  Country End of contract Accounting model Consolidation method
VINCI Highways VINCI Highways

Country

 

VINCI Highways

End of contract

 

VINCI Highways

Accounting model

 

VINCI Highways

Consolidation method

 

Vía Sumapaz 

Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km)

Vía Sumapaz 

Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km)

Country

Colombia

Vía Sumapaz 

Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km)

End of contract

2046

Vía Sumapaz 

Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km)

Accounting model

Intangible asset

Vía Sumapaz 

Toll highway connecting Bogotá and Girardot (141 km including construction of a third lane over 65 km)

Consolidation method

FC

Northwest Parkway

14 km section of the Denver ring road

Northwest Parkway

14 km section of the Denver ring road

Country

United States

Northwest Parkway

14 km section of the Denver ring road

End of contract

2106

Northwest Parkway

14 km section of the Denver ring road

Accounting model

Intangible asset

Northwest Parkway

14 km section of the Denver ring road

Consolidation method

FC

Gefyra

Toll bridge between Rio and Antirrio 

Gefyra

Toll bridge between Rio and Antirrio 

Country

Greece

Gefyra

Toll bridge between Rio and Antirrio 

End of contract

2039

Gefyra

Toll bridge between Rio and Antirrio 

Accounting model

Intangible asset

Gefyra

Toll bridge between Rio and Antirrio 

Consolidation method

FC

Lima Expresa

Línea Amarilla: 25 km toll expressway in Lima 

Lima Expresa

Línea Amarilla: 25 km toll expressway in Lima 

Country

Peru

Lima Expresa

Línea Amarilla: 25 km toll expressway in Lima 

End of contract

2049

Lima Expresa

Línea Amarilla: 25 km toll expressway in Lima 

Accounting model

Intangible asset

Lima Expresa

Línea Amarilla: 25 km toll expressway in Lima 

Consolidation method

FC

Strait Crossing Development Inc.

Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick 

Strait Crossing Development Inc.

Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick 

Country

Canada

Strait Crossing Development Inc.

Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick 

End of contract

2032

Strait Crossing Development Inc.

Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick 

Accounting model

Intangible asset

Strait Crossing Development Inc.

Confederation Bridge connecting the Canadian provinces of Prince Edward Island and New Brunswick 

Consolidation method

FC

A4 Hörselberg A-Modell

45 km

A4 Hörselberg A-Modell

45 km

Country

Germany 

A4 Hörselberg A-Modell

45 km

End of contract

2037

A4 Hörselberg A-Modell

45 km

Accounting model

Intangible asset

A4 Hörselberg A-Modell

45 km

Consolidation method

EM

A5 Malsch–Offenburg A-Modell

60 km

A5 Malsch–Offenburg A-Modell

60 km

Country

Germany 

A5 Malsch–Offenburg A-Modell

60 km

End of contract

2039

A5 Malsch–Offenburg A-Modell

60 km

Accounting model

Intangible asset

A5 Malsch–Offenburg A-Modell

60 km

Consolidation method

EM

A7 Göttingen–Bockenen A-Modell

60 km to be renovated, including 29 km to be widened to 2×3 lanes

A7 Göttingen–Bockenen A-Modell

60 km to be renovated, including 29 km to be widened to 2×3 lanes

Country

Germany 

A7 Göttingen–Bockenen A-Modell

60 km to be renovated, including 29 km to be widened to 2×3 lanes

End of contract

2047

A7 Göttingen–Bockenen A-Modell

60 km to be renovated, including 29 km to be widened to 2×3 lanes

Accounting model

Financial asset

A7 Göttingen–Bockenen A-Modell

60 km to be renovated, including 29 km to be widened to 2×3 lanes

Consolidation method

EM

A9 Six-lane A-Modell – Via Gateway Thüringen

47 km

A9 Six-lane A-Modell – Via Gateway Thüringen

47 km

Country

Germany 

A9 Six-lane A-Modell – Via Gateway Thüringen

47 km

End of contract

2031

A9 Six-lane A-Modell – Via Gateway Thüringen

47 km

Accounting model

Financial asset

A9 Six-lane A-Modell – Via Gateway Thüringen

47 km

Consolidation method

EM

B247 federal road – Via Mühlhausen

22 km plus 6 km of approach roads

B247 federal road – Via Mühlhausen

22 km plus 6 km of approach roads

Country

Germany 

B247 federal road – Via Mühlhausen

22 km plus 6 km of approach roads

End of contract

2051

B247 federal road – Via Mühlhausen

22 km plus 6 km of approach roads

Accounting model

Financial asset

B247 federal road – Via Mühlhausen

22 km plus 6 km of approach roads

Consolidation method

EM

Entrevias

Toll highways in São Paulo state (570 km)

Entrevias

Toll highways in São Paulo state (570 km)

Country

Brazil

Entrevias

Toll highways in São Paulo state (570 km)

End of contract

2047

Entrevias

Toll highways in São Paulo state (570 km)

Accounting model

Intangible asset

Entrevias

Toll highways in São Paulo state (570 km)

Consolidation method

EM

Olympia Odos

Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction

Olympia Odos

Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction

Country

Greece

Olympia Odos

Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction

End of contract

2038

Olympia Odos

Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction

Accounting model

Intangible asset

Olympia Odos

Toll motorway connecting Elefsina, Corinth and Patras, with extension to Pyrgos under construction

Consolidation method

EM

D4 motorway – Via Salis

32 km plus 16 km to be widened to 2×2 lanes

D4 motorway – Via Salis

32 km plus 16 km to be widened to 2×2 lanes

Country

Czech Republic

D4 motorway – Via Salis

32 km plus 16 km to be widened to 2×2 lanes

End of contract

2049

D4 motorway – Via Salis

32 km plus 16 km to be widened to 2×2 lanes

Accounting model

Financial asset

D4 motorway – Via Salis

32 km plus 16 km to be widened to 2×2 lanes

Consolidation method

EM

Hounslow

Rehabilitation and maintenance of roadways, traffic signs and lighting

Hounslow

Rehabilitation and maintenance of roadways, traffic signs and lighting

Country

United Kingdom

Hounslow

Rehabilitation and maintenance of roadways, traffic signs and lighting

End of contract

2037

Hounslow

Rehabilitation and maintenance of roadways, traffic signs and lighting

Accounting model

Financial asset

Hounslow

Rehabilitation and maintenance of roadways, traffic signs and lighting

Consolidation method

EM

Isle of Wight

Rehabilitation and maintenance of roadways, traffic signs and lighting

Isle of Wight

Rehabilitation and maintenance of roadways, traffic signs and lighting

Country

United Kingdom

Isle of Wight

Rehabilitation and maintenance of roadways, traffic signs and lighting

End of contract

2038

Isle of Wight

Rehabilitation and maintenance of roadways, traffic signs and lighting

Accounting model

Financial asset

Isle of Wight

Rehabilitation and maintenance of roadways, traffic signs and lighting

Consolidation method

EM

Granvia

R1 expressway (Via Pribina) between Nitra and Tekovské Nemce

Granvia

R1 expressway (Via Pribina) between Nitra and Tekovské Nemce

Country

Slovakia

Granvia

R1 expressway (Via Pribina) between Nitra and Tekovské Nemce

End of contract

2041

Granvia

R1 expressway (Via Pribina) between Nitra and Tekovské Nemce

Accounting model

Financial asset

Granvia

R1 expressway (Via Pribina) between Nitra and Tekovské Nemce

Consolidation method

EM

Regina Bypass

61 km expressway bypassing Regina

Regina Bypass

61 km expressway bypassing Regina

Country

Canada

Regina Bypass

61 km expressway bypassing Regina

End of contract

2049

Regina Bypass

61 km expressway bypassing Regina

Accounting model

Financial asset

Regina Bypass

61 km expressway bypassing Regina

Consolidation method

EM

Ohio River Bridges – East End Crossing

Bridge over the Ohio River and access tunnel

Ohio River Bridges – East End Crossing

Bridge over the Ohio River and access tunnel

Country

United States 

Ohio River Bridges – East End Crossing

Bridge over the Ohio River and access tunnel

End of contract

2051

Ohio River Bridges – East End Crossing

Bridge over the Ohio River and access tunnel

Accounting model

Financial asset

Ohio River Bridges – East End Crossing

Bridge over the Ohio River and access tunnel

Consolidation method

EM

VINCI Railways VINCI Railways

Country

 

VINCI Railways

End of contract

 

VINCI Railways

Accounting model

 

VINCI Railways

Consolidation method

 

LISEA

South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux

LISEA

South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux

Country

France

LISEA

South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux

End of contract

2061

LISEA

South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux

Accounting model

Bifurcated model: intangible asset

and financial asset 

LISEA

South Europe Atlantic high-speed rail line (302 km) between Tours and Bordeaux

Consolidation method

EM

VINCI Stadium VINCI Stadium

Country

 

VINCI Stadium

End of contract

 

VINCI Stadium

Accounting model

 

VINCI Stadium

Consolidation method

 

Consortium Stade de France

80,000-seat stadium at Saint-Denis

Consortium Stade de France

80,000-seat stadium at Saint-Denis

Country

France

Consortium Stade de France

80,000-seat stadium at Saint-Denis

End of contract

2025

Consortium Stade de France

80,000-seat stadium at Saint-Denis

Accounting model

Intangible asset

Consortium Stade de France

80,000-seat stadium at Saint-Denis

Consolidation method

FC

FC: Full consolidation; EM: Equity method.

Certain contracts may benefit from investment grants from the grantor. This relates mainly to contracts under the financial asset model, but also certain contracts with traffic level risk (Arcour – A19, LISEA and Consortium Stade de France).

As a general rule, when the contracts end, the concession infrastructure is returned to the grantor for no consideration. In the event that the contract is terminated or the asset under concession is bought out early by the grantor, compensation is payable to the concession holders. Its amount is determined in accordance with contractual or statutory provisions.