2024 Universal Registration Document

General and financial elements

  Percentage of revenue / Total revenue
  Aligned by objective Eligible by objective
Climate change mitigation 22% 39%
Climate change adaptation 0% 0%
Sustainable use and protection of water and marine resources 0% 0%
Circular economy 0% 11%
Pollution prevention and control 0% 0%
Protection and restoration of biodiversity and ecosystems 0% 0%

The Group’s Taxonomy-aligned eligible revenue is broken down by activity in the regulatory format on pages 420 to 422 (EU Taxonomy reporting tables supplementing this Report of the Board of Directors).

2.1.1.2 Eligibility and alignment of VINCI’s CapEx

At 31 December 2024, 23% of VINCI’s CapEx was eligible for and 12% was aligned to the six objectives of the EU Taxonomy. It should be noted that at 31 December 2024, nearly 50% of the Group’s CapEx, i.e. €5,257 million, related to the acquisitions of Edinburgh airport (United Kingdom) and the Northwest Parkway section of the Denver ring road (Colorado, United States), in particular the value recognised for concession rights, which are by definition not eligible (see Note B.1 to the consolidated financial statements, “Changes in consolidation scope during the period”, page 324). Without these two major acquisitions, consolidated adjusted CapEx totalled €6,152 million. By applying this denominator, VINCI’s eligible and aligned CapEx came out to 43% and 22% respectively, in line with the Group’s performance in 2023.

EU Taxonomy activities (in € millions) Objective (*) Eligible CapEx in 2024 Eligible CapEx in 2024 (%) Eligible CapEx in 2023 Eligible CapEx in 2023 (%) Aligned CapEx in 2024 Aligned CapEx in 2024 (%) Aligned CapEx in 2023 Aligned CapEx in 2023 (%)
4.1 Electricity generation using solar photovoltaic technology

4.1 Electricity generation using solar photovoltaic technology

Objective (*)

CCM

4.1 Electricity generation using solar photovoltaic technology

Eligible CapEx in 2024

641

4.1 Electricity generation using solar photovoltaic technology

Eligible CapEx in 2024 (%)

6%

4.1 Electricity generation using solar photovoltaic technology

Eligible CapEx in 2023

411

4.1 Electricity generation using solar photovoltaic technology

Eligible CapEx in 2023 (%)

9%

4.1 Electricity generation using solar photovoltaic technology

Aligned CapEx in 2024

641

4.1 Electricity generation using solar photovoltaic technology

Aligned CapEx in 2024 (%)

6%

4.1 Electricity generation using solar photovoltaic technology

Aligned CapEx in 2023

411

4.1 Electricity generation using solar photovoltaic technology

Aligned CapEx in 2023 (%)

9%

4.3 Electricity generation from wind power

4.3 Electricity generation from wind power

Objective (*)

CCM

4.3 Electricity generation from wind power

Eligible CapEx in 2024

181

4.3 Electricity generation from wind power

Eligible CapEx in 2024 (%)

2%

4.3 Electricity generation from wind power

Eligible CapEx in 2023

58

4.3 Electricity generation from wind power

Eligible CapEx in 2023 (%)

1%

4.3 Electricity generation from wind power

Aligned CapEx in 2024

178

4.3 Electricity generation from wind power

Aligned CapEx in 2024 (%)

2%

4.3 Electricity generation from wind power

Aligned CapEx in 2023

57

4.3 Electricity generation from wind power

Aligned CapEx in 2023 (%)

1%

6.14 Infrastructure for rail transport

6.14 Infrastructure for rail transport

Objective (*)

CCM

6.14 Infrastructure for rail transport

Eligible CapEx in 2024

207

6.14 Infrastructure for rail transport

Eligible CapEx in 2024 (%)

2%

6.14 Infrastructure for rail transport

Eligible CapEx in 2023

212

6.14 Infrastructure for rail transport

Eligible CapEx in 2023 (%)

5%

6.14 Infrastructure for rail transport

Aligned CapEx in 2024

161

6.14 Infrastructure for rail transport

Aligned CapEx in 2024 (%)

1%

6.14 Infrastructure for rail transport

Aligned CapEx in 2023

182

6.14 Infrastructure for rail transport

Aligned CapEx in 2023 (%)

4%

5.9 Material recovery from non-hazardous waste

5.9 Material recovery from non-hazardous waste

Objective (*)

CCM

5.9 Material recovery from non-hazardous waste

Eligible CapEx in 2024

78

5.9 Material recovery from non-hazardous waste

Eligible CapEx in 2024 (%)

1%

5.9 Material recovery from non-hazardous waste

Eligible CapEx in 2023

69

5.9 Material recovery from non-hazardous waste

Eligible CapEx in 2023 (%)

1%

5.9 Material recovery from non-hazardous waste

Aligned CapEx in 2024

77

5.9 Material recovery from non-hazardous waste

Aligned CapEx in 2024 (%)

1%

5.9 Material recovery from non-hazardous waste

Aligned CapEx in 2023

66

5.9 Material recovery from non-hazardous waste

Aligned CapEx in 2023 (%)

1%

4.9 Transmission and distribution of electricity

4.9 Transmission and distribution of electricity

Objective (*)

CCM

4.9 Transmission and distribution of electricity

Eligible CapEx in 2024

97

4.9 Transmission and distribution of electricity

Eligible CapEx in 2024 (%)

1%

4.9 Transmission and distribution of electricity

Eligible CapEx in 2023

92

4.9 Transmission and distribution of electricity

Eligible CapEx in 2023 (%)

2%

4.9 Transmission and distribution of electricity

Aligned CapEx in 2024

72

4.9 Transmission and distribution of electricity

Aligned CapEx in 2024 (%)

1%

4.9 Transmission and distribution of electricity

Aligned CapEx in 2023

75

4.9 Transmission and distribution of electricity

Aligned CapEx in 2023 (%)

2%

7.3 Installation, maintenance and repair of energy efficiency equipment

7.3 Installation, maintenance and repair of energy efficiency equipment

Objective (*)

CCM

7.3 Installation, maintenance and repair of energy efficiency equipment

Eligible CapEx in 2024

60

7.3 Installation, maintenance and repair of energy efficiency equipment

Eligible CapEx in 2024 (%)

1%

7.3 Installation, maintenance and repair of energy efficiency equipment

Eligible CapEx in 2023

72

7.3 Installation, maintenance and repair of energy efficiency equipment

Eligible CapEx in 2023 (%)

2%

7.3 Installation, maintenance and repair of energy efficiency equipment

Aligned CapEx in 2024

43

7.3 Installation, maintenance and repair of energy efficiency equipment

Aligned CapEx in 2024 (%)

0%

7.3 Installation, maintenance and repair of energy efficiency equipment

Aligned CapEx in 2023

42

7.3 Installation, maintenance and repair of energy efficiency equipment

Aligned CapEx in 2023 (%)

1%

7.7 Acquisition and ownership of buildings

7.7 Acquisition and ownership of buildings

Objective (*)

CCM

7.7 Acquisition and ownership of buildings

Eligible CapEx in 2024

284

7.7 Acquisition and ownership of buildings

Eligible CapEx in 2024 (%)

2%

7.7 Acquisition and ownership of buildings

Eligible CapEx in 2023

249

7.7 Acquisition and ownership of buildings

Eligible CapEx in 2023 (%)

5%

7.7 Acquisition and ownership of buildings

Aligned CapEx in 2024

30

7.7 Acquisition and ownership of buildings

Aligned CapEx in 2024 (%)

0%

7.7 Acquisition and ownership of buildings

Aligned CapEx in 2023

29

7.7 Acquisition and ownership of buildings

Aligned CapEx in 2023 (%)

1%

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Objective (*)

CCM

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Eligible CapEx in 2024

408

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Eligible CapEx in 2024 (%)

4%

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Eligible CapEx in 2023

354

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Eligible CapEx in 2023 (%)

8%

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Aligned CapEx in 2024

0

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Aligned CapEx in 2024 (%)

0%

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Aligned CapEx in 2023

79

6.5 Transport by motorbikes, passenger cars and light commercial vehicles

Aligned CapEx in 2023 (%)

2%

4.28 Electricity generation from nuclear energy in existing installations

4.28 Electricity generation from nuclear energy in existing installations

Objective (*)

CCM

4.28 Electricity generation from nuclear energy in existing installations

Eligible CapEx in 2024

44

4.28 Electricity generation from nuclear energy in existing installations

Eligible CapEx in 2024 (%)

0%

4.28 Electricity generation from nuclear energy in existing installations

Eligible CapEx in 2023

19

4.28 Electricity generation from nuclear energy in existing installations

Eligible CapEx in 2023 (%)

0%

4.28 Electricity generation from nuclear energy in existing installations

Aligned CapEx in 2024

32

4.28 Electricity generation from nuclear energy in existing installations

Aligned CapEx in 2024 (%)

0%

4.28 Electricity generation from nuclear energy in existing installations

Aligned CapEx in 2023

9

4.28 Electricity generation from nuclear energy in existing installations

Aligned CapEx in 2023 (%)

0%

14.2 Flood risk prevention and protection infrastructure

14.2 Flood risk prevention and protection infrastructure

Objective (*)

CCA

14.2 Flood risk prevention and protection infrastructure

Eligible CapEx in 2024

9

14.2 Flood risk prevention and protection infrastructure

Eligible CapEx in 2024 (%)

0%

14.2 Flood risk prevention and protection infrastructure

Eligible CapEx in 2023

8

14.2 Flood risk prevention and protection infrastructure

Eligible CapEx in 2023 (%)

0%

14.2 Flood risk prevention and protection infrastructure

Aligned CapEx in 2024

8

14.2 Flood risk prevention and protection infrastructure

Aligned CapEx in 2024 (%)

0%

14.2 Flood risk prevention and protection infrastructure

Aligned CapEx in 2023

0

14.2 Flood risk prevention and protection infrastructure

Aligned CapEx in 2023 (%)

0%

Other eligible activities

Other eligible activities

Objective (*)

CCM

Other eligible activities

Eligible CapEx in 2024

498

Other eligible activities

Eligible CapEx in 2024 (%)

4%

Other eligible activities

Eligible CapEx in 2023

432

Other eligible activities

Eligible CapEx in 2023 (%)

9%

Other eligible activities

Aligned CapEx in 2024

99

Other eligible activities

Aligned CapEx in 2024 (%)

1%

Other eligible activities

Aligned CapEx in 2023

55

Other eligible activities

Aligned CapEx in 2023 (%)

1%

Taxonomy-eligible activities – Climate change objectives Taxonomy-eligible activities – Climate change objectivesObjective (*)

 

Taxonomy-eligible activities – Climate change objectives

Eligible CapEx in 2024

2,506
Taxonomy-eligible activities – Climate change objectives

Eligible CapEx in 2024 (%)

22%
Taxonomy-eligible activities – Climate change objectives

Eligible CapEx in 2023

1,974
Taxonomy-eligible activities – Climate change objectives

Eligible CapEx in 2023 (%)

43%
Taxonomy-eligible activities – Climate change objectives

Aligned CapEx in 2024

1,340
Taxonomy-eligible activities – Climate change objectives

Aligned CapEx in 2024 (%)

12%
Taxonomy-eligible activities – Climate change objectives

Aligned CapEx in 2023

1003
Taxonomy-eligible activities – Climate change objectives

Aligned CapEx in 2023 (%)

22%
3.4 Maintenance of roads and motorways

3.4 Maintenance of roads and motorways

Objective (*)

CE

3.4 Maintenance of roads and motorways

Eligible CapEx in 2024

105

3.4 Maintenance of roads and motorways

Eligible CapEx in 2024 (%)

0%

3.4 Maintenance of roads and motorways

Eligible CapEx in 2023

0

3.4 Maintenance of roads and motorways

Eligible CapEx in 2023 (%)

0%

3.4 Maintenance of roads and motorways

Aligned CapEx in 2024

10

3.4 Maintenance of roads and motorways

Aligned CapEx in 2024 (%)

0%

3.4 Maintenance of roads and motorways

Aligned CapEx in 2023

-

3.4 Maintenance of roads and motorways

Aligned CapEx in 2023 (%)

-

2.2 Urban wastewater treatment

2.2 Urban wastewater treatment

Objective (*)

WTR

2.2 Urban wastewater treatment

Eligible CapEx in 2024

16

2.2 Urban wastewater treatment

Eligible CapEx in 2024 (%)

0%

2.2 Urban wastewater treatment

Eligible CapEx in 2023

0

2.2 Urban wastewater treatment

Eligible CapEx in 2023 (%)

0%

2.2 Urban wastewater treatment

Aligned CapEx in 2024

2

2.2 Urban wastewater treatment

Aligned CapEx in 2024 (%)

0%

2.2 Urban wastewater treatment

Aligned CapEx in 2023

-

2.2 Urban wastewater treatment

Aligned CapEx in 2023 (%)

-

3.3 Demolition and wrecking of buildings and other structures

3.3 Demolition and wrecking of buildings and other structures

Objective (*)

CE

3.3 Demolition and wrecking of buildings and other structures

Eligible CapEx in 2024

4

3.3 Demolition and wrecking of buildings and other structures

Eligible CapEx in 2024 (%)

0%

3.3 Demolition and wrecking of buildings and other structures

Eligible CapEx in 2023

0

3.3 Demolition and wrecking of buildings and other structures

Eligible CapEx in 2023 (%)

0%

3.3 Demolition and wrecking of buildings and other structures

Aligned CapEx in 2024

0

3.3 Demolition and wrecking of buildings and other structures

Aligned CapEx in 2024 (%)

0%

3.3 Demolition and wrecking of buildings and other structures

Aligned CapEx in 2023

-

3.3 Demolition and wrecking of buildings and other structures

Aligned CapEx in 2023 (%)

-

2.1 Water supply

2.1 Water supply

Objective (*)

WTR

2.1 Water supply

Eligible CapEx in 2024

3

2.1 Water supply

Eligible CapEx in 2024 (%)

0%

2.1 Water supply

Eligible CapEx in 2023

2

2.1 Water supply

Eligible CapEx in 2023 (%)

0%

2.1 Water supply

Aligned CapEx in 2024

0

2.1 Water supply

Aligned CapEx in 2024 (%)

0%

2.1 Water supply

Aligned CapEx in 2023

-

2.1 Water supply

Aligned CapEx in 2023 (%)

-

1.1 Conservation, including restoration, of habitats, ecosystems and species

1.1 Conservation, including restoration, of habitats, ecosystems and species

Objective (*)

BIO

1.1 Conservation, including restoration, of habitats, ecosystems and species

Eligible CapEx in 2024

1

1.1 Conservation, including restoration, of habitats, ecosystems and species

Eligible CapEx in 2024 (%)

0%

1.1 Conservation, including restoration, of habitats, ecosystems and species

Eligible CapEx in 2023

7

1.1 Conservation, including restoration, of habitats, ecosystems and species

Eligible CapEx in 2023 (%)

0%

1.1 Conservation, including restoration, of habitats, ecosystems and species

Aligned CapEx in 2024

0

1.1 Conservation, including restoration, of habitats, ecosystems and species

Aligned CapEx in 2024 (%)

0%

1.1 Conservation, including restoration, of habitats, ecosystems and species

Aligned CapEx in 2023

-

1.1 Conservation, including restoration, of habitats, ecosystems and species

Aligned CapEx in 2023 (%)

-

Other eligible activities

Other eligible activities

Objective (*)

 

Other eligible activities

Eligible CapEx in 2024

1

Other eligible activities

Eligible CapEx in 2024 (%)

0%

Other eligible activities

Eligible CapEx in 2023

6

Other eligible activities

Eligible CapEx in 2023 (%)

0%

Other eligible activities

Aligned CapEx in 2024

0

Other eligible activities

Aligned CapEx in 2024 (%)

0%

Other eligible activities

Aligned CapEx in 2023

-

Other eligible activities

Aligned CapEx in 2023 (%)

-

Taxonomy-eligible activities – Other objectives Taxonomy-eligible activities – Other objectivesObjective (*)

 

Taxonomy-eligible activities – Other objectives

Eligible CapEx in 2024

130
Taxonomy-eligible activities – Other objectives

Eligible CapEx in 2024 (%)

1%
Taxonomy-eligible activities – Other objectives

Eligible CapEx in 2023

15
Taxonomy-eligible activities – Other objectives

Eligible CapEx in 2023 (%)

0%
Taxonomy-eligible activities – Other objectives

Aligned CapEx in 2024

12
Taxonomy-eligible activities – Other objectives

Aligned CapEx in 2024 (%)

0%
Taxonomy-eligible activities – Other objectives

Aligned CapEx in 2023

-
Taxonomy-eligible activities – Other objectives

Aligned CapEx in 2023 (%)

-
Total eligible activities Total eligible activitiesObjective (*)

 

Total eligible activities

Eligible CapEx in 2024

2,636
Total eligible activities

Eligible CapEx in 2024 (%)

23%
Total eligible activities

Eligible CapEx in 2023

1,989
Total eligible activities

Eligible CapEx in 2023 (%)

43%
Total eligible activities

Aligned CapEx in 2024

1,352
Total eligible activities

Aligned CapEx in 2024 (%)

12%
Total eligible activities

Aligned CapEx in 2023

1 ,03
Total eligible activities

Aligned CapEx in 2023 (%)

22%
Non-eligible activities

Non-eligible activities

Objective (*)

 

Non-eligible activities

Eligible CapEx in 2024

8,773

Non-eligible activities

Eligible CapEx in 2024 (%)

77%

Non-eligible activities

Eligible CapEx in 2023

2,638

Non-eligible activities

Eligible CapEx in 2023 (%)

57%

Non-eligible activities

Aligned CapEx in 2024

 

Non-eligible activities

Aligned CapEx in 2024 (%)

 

Non-eligible activities

Aligned CapEx in 2023

 

Non-eligible activities

Aligned CapEx in 2023 (%)

 

Total VINCI consolidated CapEx Total VINCI consolidated CapExObjective (*)

 

Total VINCI consolidated CapEx

Eligible CapEx in 2024

11,409
Total VINCI consolidated CapEx

Eligible CapEx in 2024 (%)

100%
Total VINCI consolidated CapEx

Eligible CapEx in 2023

4,628
Total VINCI consolidated CapEx

Eligible CapEx in 2023 (%)

100%
Total VINCI consolidated CapEx

Aligned CapEx in 2024

 

Total VINCI consolidated CapEx

Aligned CapEx in 2024 (%)

 

Total VINCI consolidated CapEx

Aligned CapEx in 2023

 

Total VINCI consolidated CapEx

Aligned CapEx in 2023 (%)

 

Eligible activities

At 31 December 2024, 43% of the Group’s CapEx was eligible, excluding the acquisitions of Edinburgh airport and the Northwest Parkway section of the Denver ring road (stable relative to 2023). The analysis of the water, circular economy, pollution and biodiversity objectives identified additional eligible activities but that do not contribute significantly to the Group’s alignment percentage.

Aligned activities

At 31 December 2024, the percentage of the Group’s Taxonomy-aligned CapEx excluding the acquisitions of Edinburgh airport and the Northwest Parkway section of the Denver ring road was stable compared with 2023, at 22%. The main contributing activities were as follows:

Climate change mitigation objective

  • Activities 4.1 and 4.3: these investments mainly cover aligned activities of Cobra IS to build and operate electricity generation facilities powered by renewable energy sources, either solar or wind, such as the Mundo Novo Solar and Raios do Parnaíba projects in Brazil.
  • Activity 6.14: this CapEx mainly relates to aligned VINCI Construction activities in railway infrastructure.
  • Activity 5.9: this CapEx mainly corresponds to the percentage of fully recycled asphalt mix that VINCI Autoroutes uses on its road maintenance worksites and, to a lesser extent, to VINCI Construction’s CapEx relating to its aligned aggregate recycling activities.
  • Activity 4.9: this CapEx relates to the electricity transmission and distribution activities of VINCI Energies and Cobra IS.
  • Activity 7.3: this CapEx relates to aligned activities of VINCI Energies and the Concessions business involving the installation, maintenance and repair of energy efficient equipment in buildings.
  • Activity 7.7: this CapEx corresponds to long-term leases of buildings with an energy performance score of A (only in France).
  • Activity 4.28: this CapEx primarily involves nuclear plant maintenance by VINCI Energies and VINCI Construction in France.