Shell Lavéra-Berre oil pipeline

Sogea

Picture with legend
22,5 kilometres of the Shell Lavéra-Berre oil pipeline. Concrete-lined maritime sections.

In 1963, Sogea took part in the construction of the Lavéra-Berre-St-Auban oil pipeline. Sogea built 22.5 kilometres of the pipeline, which was 124 kilometres long upon completion in 1968.