Shell Lavéra-Berre oil pipeline
Sogea
/2E3A73D6DAFC0101C1256A8B00569E8E/$file/2_104.jpg)
22,5 kilometres of the Shell Lavéra-Berre oil pipeline. Concrete-lined maritime sections.
In 1963, Sogea took part in the construction of the Lavéra-Berre-St-Auban oil pipeline. Sogea built 22.5 kilometres of the pipeline, which was 124 kilometres long upon completion in 1968.
